
2.8g PP Material Smooth Milk Powder Spoon Mold with Stripper System and Work Full Automatic
-
Min Order
1
-
Product Unit
Pieces
-
Origin
China Mainland
-
Payment
- Contact Now Start Order
- Favorites Share
- Description
Product Detail
2.8g PP Material Smooth Milk Powder Spoon Mold with Stripper System and Work Full Automatic
2.8g PP disposable milk powder spoon mould | |
Mold Size | 400x350mm / advice choose 120Ton machine |
Mold Steel | 718H steel, original hardness HRC30 degree |
Mold steel treatment way | At final arranged thur. nitrogen for core and cavity to 48-52 degree |
Mold gate way | Full hot runner (point gate hot runner system) |
Mold uselife | 500000 shots |
Mold cycle time | 20 sec |
1st. Test mold time | 55 days after confirmed mold drawing files |
Mold exported to | Bangladesh |
Mold doff way | Choose stripper system |
Mould make step like this photo shown
OSKAI Mould already made a lot spoon moulds for different countries. sometime they will ask this list questions:
-Can you tell me your spoon mold cycle time?
On normal the spoon mold cycle time will be about 12-20 sec., that will be different depend on choose different machine, different thickness design, different cooling deign.
-Which steel choose will be best for this type of mould?
We advice choose hardness steel, such as 1.2344 steel, this steel original hardness already 32-34 degree, after arrange vacuum quenching treatment, whole plate hardness will be about HRC45 degree about. Everybody know more hardness will be good for mould use-life.
-Which gate way choose for this type of mould better?
On normal if less than 10 cavities, we advice choose full hot runner system. if more than 10 cavities, we advice choose cold runner system, or semi-hot runner.
-How about your delivery time?
If choose normal steel, we only need 30 days then can be ready for test, 40 days about can be arranged shipment. If choose hardness steel, need 10 days more.
Process | |
Mold steel | P20, 718, 2738, 2344, 2316, S136, 3Cr13, 38CrMoAl, Mov and more |
Mold cavity | 1 or more (depend on client) |
Surface treatments | electroplate (in order to prevent rust), thur. nitrogen (in order to rise surface hardness), vacuum quenching (in order to rise whole hardness) |
Plastic materials | PP, PVC, PPR, ABS, PA, PC, POM, PS, PET, HDPE, LDPE and other |
Software | UG, PRO-E, MOLDFLOW, CAD, CAE, VISI |
Mold gate way | cold runner/hot runner/semi-hot runner |
Mold base | HASCO, DME, LKM, HOME-MADE |
Mold doff system | ejectors, off-plate, air valves, hydraulic jars, air jars, air ejectors, oil-motor and more |
Mold cooling | Water cooling/air cooling/beryllium bronze cooling |
Mold payment | 50% down payment by T/T, 50% balance by T/T before shipment |
Mold shipment | By sea/air/train |
Mold packaging | packed into standard wooden cases |
Mold quotation | most reasonable as rich experience |
Technology
1) Mould structure design
Professional designers provide you with reasonably designed mould to shorten cycle hours.
Reducing unnecessary procedure improves efficiency.
2) Mould cooling system
According to the structural characteristics of the product and the appearance of the product , We design a reasonable form of gate for mould, such as a large gate, hidden gate, fan gate, needle gate, pin point gate etc., a reasonable channel of runner design make mold temperature balance in the shortest time to improve mould precision and productivity.
3) Accessory for mould
Slide, guide pin, guide sleeve, lifter blocks and so on are taken by wear-resistant standard parts, to ensure the mould life.
4) Deal with mould
Quenching the mold, heat treatment to improve the hardness, then Nitriding temperature is lower , the mold will no longer need to quench mold with high surface hardness and wear resistance more than HV850
Service
1) We can repair the mould in one year for some free and provide technology. .
2) Gurantee period is 12months starting from the date of moulds accept in the Buyer’s factory.
3) If the moulds happen the big problem, The moulds cannot repaired, the Buyer cannot solve the problems,eg, mould crack, product can’t moulding…any big problem(except the human error) due to the mould life can’t reach to guranteed shots.the Seller and Buyer's negotiate to slove the problem, the buyer can send it back to the factory to repair or If serious, the Seller have resposiblity to make new mould for the Buyer.
- Moulds 1 Pieces / (Min. Order)
- M01015 1 Pieces / (Min. Order)
- M03022 1 Pieces / (Min. Order)
- M92150 1 Pieces / (Min. Order)
- M92151 1 Pieces / (Min. Order)
- M91150 1 Pieces / (Min. Order)
- M03015 1 Pieces / (Min. Order)
- M03019 1 Pieces / (Min. Order)
- Medical Connector 1 Pieces / (Min. Order)
- Medical Capsule Blow Mold 1 Pieces / (Min. Order)
- Medical Rubber Parts 1 Pieces / (Min. Order)
- Medical Stopcock 1 Pieces / (Min. Order)
- Medical Stopcock-2 1 Pieces / (Min. Order)
- Infants Suction Catheter 1 Pieces / (Min. Order)
- Central Venous Catheter 1 Pieces / (Min. Order)
- M280LL 1 Pieces / (Min. Order)
- Insulated Pallet Container 1 Pieces / (Min. Order)
- Insulated Cold Storage Container 1 Pieces / (Min. Order)
- Cold Chain Container 1 Pieces / (Min. Order)
- Roto molded cooler 1 Pieces / (Min. Order)