
4 in 1 Dual Magneto Laser and RF Multifunctional Machine
-
Min Order
1
-
Product Unit
Pieces
-
Origin
China Mainland
-
Payment
- Contact Now Start Order
- Favorites Share
- Description
Product Detail
Magneto-optical treatment stage:
1) start up:Open the instrument power switch, the instrument display light, the system circuit immediately into the self-test state, the operator in this case should allow the instrument to run their own 5 minutes before proceeding?
Note: If the power switch is turned on and the display is still off, check that the emergency stop switch is reset. Rotate the emergency stop switch in the correct direction to reset the emergency stop switch. The instrument enters the standby mode?
2)Preheating:Preheat the instrument for at least three minutes, do not turn on the lights?
Purpose: to fully circulate the water in the water pipe, so as to avoid the smooth circulation of many times caused by bald gun phenomenon, to ensure the safety of operation?
3)shave:Scrape off the face of excess hair, forehead, eyebrows, two sideburns, cheeks, lips and other hair. (Two minutes)
Purpose: hair is black, the operation will absorb part of the black light, the skin will absorb the light will be reduced, reducing the nursing effect; black hair absorption process will increase the care of the tacit taste, so to scratch the hair ; If not scrape the hair, absorb the light of the small fluff will remain in the skin epidermis part of the heat, may increase the skin's sensitivity?
4)Coated with gel:Magneto-care is a gel;
In the care items, care parts must be evenly coated 2-3mm thick cold gel (two minutes) (If the hair removal project need to scratch the hair (slightly stay a little) and then coated with cold gel)?
5)Eye protection:Require the caregiver to close his eyes and cover the eyes with wet cotton or professional goggles?
Role: to avoid the caregiver to see the light and tension, play a role in appeasement?
6)Check allergy:Adjust the safety parameters at the ear root to do two to three spots, observe the three minutes?
Action: Do not continue to operate?
7)operating:Reconfigure the parameters for the order of the operation. (Twenty minutes or so)
8)Fumian:After the end of the operation will be cold gel to stay in the face for about 20 minutes, if the care after a larger reflection, red holding time longer cold water or ice water can be applied to the red?
9)Cleaning:With cold water cleaning care parts of the cold gel, apply care after repair products
Care of general skin problems, the first seven days of repair repair water products 7 days, seven days later at night other skin care products normal?
- Printing Machine Wedding Card Screen Printing Machine 1 Pieces / (Min. Order)
- HDJ Series Multi-direction Motion Mixer 1 Pieces / (Min. Order)
- High-speed ATUO Quantitative Packing Scale 1 Pieces / (Min. Order)
- Pneumatic Multiple Seismic Modeling Of Contact Force Compaction Machine 1 Pieces / (Min. Order)
- YL1 Series Single Phase Two Value Capacitor Induction Motor HP 1 Pieces / (Min. Order)
- Pipeline High Cutting Separate Emulsification Machine 1 Pieces / (Min. Order)
- Pipeline High Cutting Separate Emulsification Machine 1 Pieces / (Min. Order)
- Small High Shearing Emulsification Machine 1 Pieces / (Min. Order)
- WLG Continuous-drying Sterilization Machine 1 Pieces / (Min. Order)
- IC Has An Iron Core Series Of Linear Induction Motor 1 Pieces / (Min. Order)
- ICD Has An Iron Core Series Of Linear Induction Motor 1 Pieces / (Min. Order)
- Engraving 2D Laser Machine 1 Pieces / (Min. Order)
- Marine Bronze Screw Down Check Angle Valve JIS F7352 5k 1 Pieces / (Min. Order)
- GZL Series Dry Rolling Granulation Machine 1 Pieces / (Min. Order)
- BA 900 BT Driving Type Fully Automatic Machine Wash And Dry 1 Pieces / (Min. Order)
- Cooling Pipe Leakage Connector (European Integrated Type) 1 Pieces / (Min. Order)
- TAL-6U-A Europeanize Keep The Knot Type Suction Machine 1 Pieces / (Min. Order)
- TAL-300E Keep The Knot Type Vacuum Suction Machine 1 Pieces / (Min. Order)
- Zero Inserting Force Connerctor (260 Pins) 1 Pieces / (Min. Order)
- Production Line Of Six Tons Of Block Machine 1 Pieces / (Min. Order)